Greetings,

You are now relieved from the responsibilities of working in the specified workflow stage on the documents below.

SL NoDocument NumberDocument DescriptionProject IDProject DescriptionWorkflow Stage
1TCE.14444A-ME-6178-BS-60000Piping Design basisTCE.14444AEPCM of Silica Sand Beneficiation ProjectDesign (AD)
2TCE.14444A-ME-6178-PP-60001Pipe Material Specification & Valve Material SpecificationTCE.14444AEPCM of Silica Sand Beneficiation ProjectDesign (AD)
3TCE.14444A-ME-6178-STD-60002Piping support standardTCE.14444AEPCM of Silica Sand Beneficiation ProjectDesign (AD)
4TCE.14444A-ME-6178-LS-60003Check List Of 3D Model For 30%, 60% And 90% StagesTCE.14444AEPCM of Silica Sand Beneficiation ProjectDesign (AD)
5TCE.14444A-ME-6178-LS-60004Tie-in schedule / BATTERY LIMIT scheduleTCE.14444AEPCM of Silica Sand Beneficiation ProjectDesign (AD)
6TCE.14444A-ME-6178-PP-60005Yard Piping concept layoutTCE.14444AEPCM of Silica Sand Beneficiation ProjectDesign (AD)
7TCE.14444A-ME-6178-LS-60006Stress critical Line listTCE.14444AEPCM of Silica Sand Beneficiation ProjectDesign (AD)
8TCE.14444A-ME-6178-LS-60007Valve listTCE.14444AEPCM of Silica Sand Beneficiation ProjectDesign (AD)
9TCE.14444A-ME-6178-PP-6000830% Piping 3D model using S3D and model review & close out reportTCE.14444AEPCM of Silica Sand Beneficiation ProjectDesign (AD)
10TCE.14444A-ME-6178-BQ-60009Preliminary MTO -Pipe workTCE.14444AEPCM of Silica Sand Beneficiation ProjectDesign (AD)


Comments: User has been reassigned by Haimi Kuchlyan(PMIS internal)

Sent By:
Haimi Kuchlyan
(hkuchlyan@tataconsultingengineers.com)


Sent from WRENCH SmartProject®

Mail Identifier: 1012946851